首页> 外文期刊>E&P daily >Chevron’s Rosebank progress
【24h】

Chevron’s Rosebank progress

机译:Cervon的Rosbank进步

获取原文
获取原文并翻译 | 示例
           

摘要

US major Chevron says it is pushing ahead with development work for the Rosebank field that lies 129km west of the Shetland Islands. “The Rosebank project is progressing through the Front End Engineering and Design phase. The joint venture participants have made significant progress in optimising the Rosebank facilities and have identified changes to the scope of the facilities, which we expect to deliver a reduction in development costs and a consequent improvement in project value,” said Alex Yelland, Chevron UK’s manager for Policy, Government and Public Affairs.
机译:美国专业雪佛龙表示,它正在推动罗斯巴克领域的开发工作,位于驻地群岛以西129km。 “Rosebank项目正在通过前端工程和设计阶段进行。 合资企业参与者在优化罗斯银行设施方面取得了重大进展,并确定了对设施范围的变化,我们希望减少开发成本和随后的项目价值的改善,“雪佛龙英国的经理 政策,政府和公共事务。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号