...
首页> 外文期刊>圧力技術 >Study on the materials of coal liquefaction pilot plant (The 3rd Report) - Letdown valve and block valve -
【24h】

Study on the materials of coal liquefaction pilot plant (The 3rd Report) - Letdown valve and block valve -

机译:煤液化试验厂材料的研究(第3次报告) - Letdown阀和块阀 -

获取原文
获取原文并翻译 | 示例

摘要

Letdown valves and block valves in 150t/d Bituminous coal liquefaction pilol plant (PP) were operated under the most severe abrasive environments such as the high temperature of coal slurry at 380 approx 460 deg C and the high pressure difference, 16.7 approx 18.7MPa. In these conditions, the erosion and the abrasion were predicted on the parts of these valves. Letdown valves are installed at the line between high temp. separator and atmospheric column. The liquid level in high temp. separator is controlled and the pressure of fluid is depressurized up to the operating pressure of atmospheric columm. Block valves were installed at the line to the blow down system and were operated at intermittently, for protecting the pressure increase at liquefaction reactors. The nondestructive inspection such as visual, penetration test etc. and the fracture tests such as hardness, micro structure, SEM view etc. were carried outr for these at intermittently, for protecting the pressure increase at liquefaction reactors. The nondestructive inspection such as visual, penetration test etc. and the fracture tests such as hardness, micro structure, SEM view etc. were carried out for these valves. The fine grain based tungsten carbide (WC) and the sintered diamond for letdown valve and SUSF321/Stellite + Plasma Chemical Vapor Deposition (PCVD) treatment for block valve, are useful for coal liquefaction plant, in which the function of protect for the erosion and the abrasion is enhanced. The adequacy of the selecting materials in PP was confirmed through this inspection study. Basically, the most proper material selections, by the evaluation of he materials based on these results of this inspections, by the evaluation of the materials based on these results of this inspection study, are expected for the material selection of commercial plant in the long period operation.
机译:在150t / d烟煤液液化皮层植物(PP)的情况下,在最严重的磨料环境下运行Letdown阀和块阀,例如380℃的煤浆等高温,高压差,16.7近18.7MPa。在这些条件下,预测侵蚀和磨损在这些阀的部件上。 Letdown阀门安装在高温之间的线路。分离器和大气柱。高温下的液体水平。控制分离器,流体的压力降低到大气金属的工作压力。将块阀安装在线到吹送系统,间歇地操作,以保护液化反应器的压力增加。视觉,渗透试验等的非破坏性检查和诸如硬度,微结构,SEM视图等的断裂试验,用于间歇地突出,用于保护液化反应器处的压力增加。对于这些阀门进行了视觉,渗透试验等的非破坏性检查和诸如硬度,微结构,SEM视图等的断裂试验。用于储存阀的细粒基碳化钨(Wc)和烧结金刚石和用于阻塞阀的SUSF321 /钝旋+等离子化学气相沉积(PCVD)处理,可用于煤液化厂,其中保护侵蚀和侵蚀的功能磨损增强了。通过该检查研究证实了PP中选择材料的充分性。基本上,通过基于这些检查结果的这些结果评估他材料的评估,通过基于这些检查研究的这些结果的评估,预计在长期内商业厂的材料选择预期手术。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号