首页> 外文期刊>Journal of intelligent & fuzzy systems: Applications in Engineering and Technology >Evaluation methods for completed Six Sigma projects through an interval type-2 fuzzy ANP
【24h】

Evaluation methods for completed Six Sigma projects through an interval type-2 fuzzy ANP

机译:通过间隔Type-2模糊ANP完成六个Sigma项目的评估方法

获取原文
获取原文并翻译 | 示例
           

摘要

We propose project evaluation criteria by considering not only the Six Sigma approach, but also European Foundation for Quality Management (EFQM) model features, and introduce an evaluation model for completed Six Sigma projects. The proposed model uses seven main criteria: leadership, policies/strategies, main performance results, social results, employees, cooperation, and resources. These main criteria are enhanced by 18 sub-criteria. Due to the evaluation scale being based on human judgments, fuzzy set theory is an obvious methodology choice to account for uncertainty in the evaluation data. Type-2 fuzzy sets can provide flexibility for uncertainty by considering membership functions and their footprints. We also propose an evaluation methodology for weighting the main and sub-criteria and for ranking completed Six Sigma projects through a fuzzy analytic network process (ANP) method with interval type-2 fuzzy sets. From our analysis, performance results were found to have the highest weight among the seven main criteria, while achieving project objectives was found to be the most effective criteria.
机译:我们通过考虑不仅考虑六西格玛方法,而且欧洲质量管理(EFQM)模型特征的基础提出了项目评估标准,并为已完成的六西格玛项目进行了评估模型。拟议的模型使用七个主要标准:领导力,政策/策略,主要绩效结果,社会业绩,员工,合作和资源。这些主要标准增强了18个子标准。由于评估规模基于人类判断,模糊集理论是一个明显的方法选择,以解释评估数据中的不确定性。 Type-2模糊集可以通过考虑成员函数及其脚印来提供不确定性的灵活性。我们还提出了一种评估方法,用于加权主要和子标准,并通过具有间隔类型-2模糊集的模糊分析网络过程(ANP)方法来排序完成的六个Sigma项目。从我们的分析中,发现绩效结果在七个主要标准中具有最高重量,同时发现了实现项目目标是最有效的标准。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号