首页> 外文期刊>Journal of Petroleum Technology >Data-Acquisition Optimization Maximizes Value of Mature Oil-Rim Reservoirs
【24h】

Data-Acquisition Optimization Maximizes Value of Mature Oil-Rim Reservoirs

机译:数据采集优化最大限度地提高了成熟的油轮储层的价值

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

The XamXung field offshore Sarawak,Malaysia,is a 47-year brownfield with thin remaining oil rims that have made field management challenging.The dynamic oil-rim movement has been a key subsurface uncertainty,particularly with the commencing of a redevelopment project.A reservoir,well,and facilities-management (RWFM) plan was implemented to optimize development decisions.This paper is a continuation of paper SPE174638 and outlines the outcome of the RWFM plan and the results'effect on development decisions such as infill well placement and gas/water injection-scheme optimization (Fig.1).Key decisions affected by the RWFM findings are highlighted in the complete paper.
机译:马来西亚Xamxung Field Sarawak是一个47年的布朗菲尔德,剩余的剩余石油轮辋,使得现场管理挑战挑战。动态油轮运动是一个关键的地下不确定性,特别是随着重建项目的开始。水库 ,嗯,设施 - 管理(RWFM)计划得到实施以优化发展决策。本文是纸张SPE174638的延续,并概述了RWFM计划的结果,并揭示了填充井放置和天然气的发展决策的结果 注水方案优化(图1)。受RWFM调查结果影响的措施在完整纸上突出显示。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号