【24h】

First E&P talks Nigeria FPSO and gas giant

机译:E&P首次会谈尼日利亚FPSO和天然气巨头

获取原文
获取原文并翻译 | 示例
           

摘要

First E&P is talking to FPSO contractors about a US $800m phased development of the shallow water Anyala and Madu fields off Nigeria saying it wants to take advantage of current project pricing. The company had been looking at a multi-platform and FSO development of the fields in OMLs 83 and 85 but is said to have decided that using small conductor-supported minimum facility wellhead platforms and a leased FPSO is the most cost effective option with the lowest up-front capital needed. It also avoids problems of onshore pipeline sabotage.
机译:First E&P正在与FPSO承包商商谈尼日利亚沿海浅水Anyala和Madu油田的8亿美元分期开发项目,称其希望利用当前的项目定价。该公司一直在研究OML 83和85中的油田的多平台和FSO开发,但据说已决定使用小型导体支持的最小设施井口平台和租赁FPSO是成本最低,成本最低的选择。需要先期资金。它还避免了陆上管道破坏的问题。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号