首页> 外文期刊>Journal of Engineering & Applied Sciences >Methods for the Reduction of Loss and Optimization Processes Open Pit Mining Operations When Mining Man-Made Deposits Formed by Sections
【24h】

Methods for the Reduction of Loss and Optimization Processes Open Pit Mining Operations When Mining Man-Made Deposits Formed by Sections

机译:减少损失和优化的方法过程开放坑挖掘运营在挖掘由部分形成的人造沉积物时

获取原文
获取原文并翻译 | 示例
           

摘要

Exploitation of a man-made deposit formed by sections should be conducted with a minimum number of technological operations in order to improve the technical and economic performance of the enterprise involved in its development. This study describes methods for reducing the losses that arise during maintenance of a man-made deposit formed by sections, using a pull shovel or a walking dredge, the dependence of linear approximations of the faces of the walking dredge, dumpers installation diagram for loading while processing man-made raw materials within the sections. A mathematical model is provided that describes open-pit mining process flow during the development of a man-made deposit obtained by the method of linear programming. The research results allow involving man-made deposits with valuable minerals and at minimal cost.
机译:应采用部分组成的人造押金,应当以最小数量的技术操作进行,以改善涉及其发展的企业的技术和经济绩效。 本研究描述了使用拉铲或行走疏浚,使用拉铲或行走疏浚的依赖性的依赖于行走挖掘机,转储器安装图的依赖性,减少在维护由切片形成的人造矿床期间产生的损失的方法。 在部分内加工人造原料。 提供了一种数学模型,其描述了在通过线性规划方法获得的人造沉积物的开发期间描述了敞篷挖掘过程流程。 研究结果允许涉及人造沉积物,以贵重的矿物质和最低成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号