首页> 外文期刊>World Coal >POLAND GE Power wins EPC contract for Ostroleka C coal power plant
【24h】

POLAND GE Power wins EPC contract for Ostroleka C coal power plant

机译:波兰GE Power为Ostroleka C煤电厂赢得EPC合同

获取原文
获取原文并翻译 | 示例
           

摘要

On 4 March, GE Power was informed that it has been chosen as the lead EPC, in consortium with Alstom Power Systems, to build the ultra-supercritical (USC) coal power plant Ostroleka C in Poland. Subject to the financial closure of the project, the plant will start commercial operation within 56 months after the notice to proceed and generate a gross output of 1000 MW, enough to power 300 000 homes in Poland.
机译:3月4日,GE Power被告知它已被选为与阿尔斯通电力系统联盟的主要EPC,以构建波兰的超超临界(USC)煤电厂Ostroleka C. 根据该项目的金融闭幕,该工厂将在通知后56个月内开始商业运营,以便在1000兆瓦的总产量上,足以在波兰动力300 000家。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号