首页> 外文期刊>Theoretical and Experimental Plant Physiology >Phase II control charts for monitoring dispersion when parameters are estimated
【24h】

Phase II control charts for monitoring dispersion when parameters are estimated

机译:估计参数时监视分散的阶段控制图

获取原文
获取原文并翻译 | 示例
           

摘要

Shewhart control charts are among the most popular control charts used to monitor process dispersion. To base these control charts on the assumption of known in-control process parameters is often unrealistic. In practice, estimates are used to construct the control charts and this has substantial consequences for the in-control and out-of-control chart performance. The effects are especially severe when the number of Phase I subgroups used to estimate the unknown process dispersion is small. Typically, recommendations are to use around 30 subgroups of size 5 each.We derive and tabulate new corrected charting constants that should be used to construct the estimated probability limits of the Phase II Shewhart dispersion (e.g., range and standard deviation) control charts for a given number of Phase I subgroups, subgroup size and nominal in-control average run-length (ICARL). These control limits account for the effects of parameter estimation. Two approaches are used to find the new charting constants, a numerical and an analytic approach, which give similar results. It is seen that the corrected probability limits based charts achieve the desired nominal ICARL performance, but the out-of-control average run-length performance deteriorate when both the size of the shift and the number of Phase I subgroups are small. This is the price one must pay while accounting for the effects of parameter estimation so that the in-control performance is as advertised. An illustration using real-life data is provided along with a summary and recommendations.
机译:Shewhart Control图表是用于监控过程分散的最流行的控制图表之一。为了基于已知的控制过程参数的假设基于这些控制图,通常是不现实的。在实践中,估算用于构建控制图,这对控制和控制和控制图表性能具有重大影响。当用于估计未知过程分散的I阶段子组的数量小时,效果特别严重。通常,建议是使用大约30个大小5子组.we导出和制表新的校正图表常数,该常量应该用于构造阶段II削波色散(例如,范围和标准偏差)控制图的估计概率限制给定阶段I子组,子组大小和标称控制平均流量长度(ICARL)。这些控制限制占参数估计的影响。两种方法用于查找新的图表常量,数字和分析方法,其提供类似的结果。可以看出,基于校正概率限制的图表实现了所需的标称ICARL性能,但是当换档的尺寸和阶段I子组的数量都小时,控制的平均流量长度性能恶化。这是一个必须支付的价格,同时占参数估计的影响,以便控制性能如广告。使用现实生活数据的插图以及摘要和建议提供。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号