首页> 外文期刊>The Asia Miner >Ulaan Ovoo remains on standby
【24h】

Ulaan Ovoo remains on standby

机译:乌兰ovoo仍然待命

获取原文
获取原文并翻译 | 示例
           

摘要

PROPHECY Development Corp continues to keep operations at its Ulaan Ovoo Thermal Coal Project in northern Mongolia on standby during the global coal downturn. Modest sales to local customers from existing stockpiles are continuing and Prophecy is expected to reassess its production decision during the current quarter. During the March quarter the mine shipped 760 tonnes of coal to local customers, realising sales revenue of US$24,090. This compared to sales of 26,400 tonnes during the same period in 2015 and sales revenue of $600,000. Prophecy intends to continue with the sale and loading of remaining stockpiled Ulaan Ovoo coal with the goal of completing this during the September quarter.
机译:预言开发公司继续在全球煤炭衰退期间在蒙古北部的北部北部乌兰ovoo热煤项目上继续运营。 对现有库存的当地客户的适度销售持续,预计预先在本季度重新评估其生产决定。 三月四月,矿井将760吨煤炭运往本地客户,实现销售收入为24,090美元。 这与2015年同期同期销售额相比,销售收入为600,000美元。 预言打算继续促销和装载剩余的储存乌兰ovoo煤,其目标是在9月季度完成这一目标。

著录项

  • 来源
    《The Asia Miner》 |2016年第3期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 矿业工程;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号