首页> 外文期刊>Process & Plant Engineering >Iconic bridge project connecting Hong Kong to Zhuhai and Macau adopts BIM methodology, reducing construction costs by 12%
【24h】

Iconic bridge project connecting Hong Kong to Zhuhai and Macau adopts BIM methodology, reducing construction costs by 12%

机译:将香港与珠海和澳门联系的标志性桥梁项目采用BIM方法,降低建筑成本12%

获取原文
获取原文并翻译 | 示例
           

摘要

The Leighton-Chun Wo joint venture standardized on a BIM methodology to drive consistency on this large multi-discipline design project that will connect Hong Kong, Macau, and Zhuhai. This revolutionary project includes 50 kilometers of bridges and tunnels and will create a distinctive entry point to Hong Kong. Leighton Asia conducted the civil, electrical, mechanical, structural, subsurface, and building work as the lead contractor for this ambitious project.
机译:Leighton-Chun WO合资企业标准化了BIM方法,以推动这一大型多学科设计项目的一致性,将连接香港,澳门和珠海。 这项革命性项目包括50公里的桥梁和隧道,并将为香港创造一个独特的入境点。 Leighton Asia通过这项雄心勃勃的项目进行了民用,电气,机械,结构,地下和建筑工作,作为铅承包商。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号