首页> 外文期刊>platts Inside FERC's Gas Market Report >FErC pressed to stop work on Weymouth compressor after court ruling
【24h】

FErC pressed to stop work on Weymouth compressor after court ruling

机译:在法院裁决之后,FERC被迫停止韦茅斯压缩机

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission is being urged to stop construction on Enbridge’s Weymouth, Massachusetts, compressor station after the 1st US Circuit Court of Appeals vacated an air permit for the project. In light of the ruling, two nonprofit groups opposed to the project and Representative Stephen Lynch, the Democratic congressman representing Weymouth, asked FERC to halt construction of the compressor, which would enable northbound natural gas flows on Maritimes & Northeast Pipeline and into Canada.
机译:在美国巡回赛的第1次巡回法院腾出该项目的空中许可证之后,敦促联邦能源监督委员会停止馆·韦茅斯,压缩机站。 鉴于裁决,代表韦茅斯的民主党国会议员的项目和代表斯蒂芬林基反对的非营利组织要求FERC停止建设压缩机,这将使北行天然气流动在海域和东北管道和加拿大。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号