首页> 外文期刊>Platts Energy Trader >FERC pressed to stop work on Weymouth compressor after court ruling
【24h】

FERC pressed to stop work on Weymouth compressor after court ruling

机译:在法院裁决后,FERCE被迫停止韦茅斯压缩机

获取原文
获取原文并翻译 | 示例
           

摘要

The Federal Energy Regulatory Commission is being urged to stopconstruction on Enbridge’s Weymouth, Massachusetts, compressorstation after the 1st US Circuit Court of Appeals vacated an air permitfor the project.In light of the ruling, two nonprofit groups opposed to the projectand Representative Stephen Lynch, the Democratic congressmanrepresenting Weymouth, asked FERC to halt construction of thecompressor, which would enable northbound natural gas flows onMaritimes & Northeast Pipeline and into Canada.
机译:敦促联邦能源监管委员会停止恩布桥韦茅斯,马萨诸塞州,压缩机的施工第一届美国巡回赛课程后的车站腾出航空许可证对于项目。鉴于裁决,两个非营利组织反对该项目和民主党国会议员的代表斯蒂芬林奇代表Weymouth,要求FERC停止建设压缩机将使北行天然气流动Maritimes和东北管道和加拿大。

著录项

  • 来源
    《Platts Energy Trader》 |2020年第9期|16-17|共2页
  • 作者

    Maya Weber;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号