...
首页> 外文期刊>Structure and Infrastructure Engineering >Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process
【24h】

Selection of maintenance, renewal and improvement projects in rail lines using the analytic network process

机译:使用分析网络过程选择铁路线路维护,续订和改进项目

获取原文
获取原文并翻译 | 示例

摘要

This paper addresses one of the most common problems that a railway infrastructure manager has to face: to prioritise a portfolio of maintenance, renewal and improvement (MR&I) projects in a railway network. This decision-making problem is complex due to the large number of MR&I projects in the portfolio and the different criteria to take into consideration, most of which are influenced and interrelated to each other. To address this problem, the use of the analytic network process (ANP) is proposed. The method is applied to a case study in which the Local Manager of the public company, who is responsible for the MR&I of Spanish Rail Lines, has to select the MR&I projects which have to be executed first. Based on the results, it becomes evident that, for this case study, the main factor of preference for a project is the location of application rather than the type of project. The main contributions of this work are: the deep analysis done to identify and weigh the decision criteria, how to assess the alternatives and provide a rigorous and systematic decision-making process, based on an exhaustive revision of the literature and expertise.
机译:本文涉及铁路基础设施经理面临的最常见问题之一:在铁路网络中优先考虑维护,续订和改进(MR&I)项目的优先级。由于投资组合中的大量先生和我所考虑的不同标准,这一决策问题是复杂的,其中大部分是影响和相互关联的。为了解决这个问题,提出了使用分析网络过程(ANP)。该方法适用于案例研究,其中负责西班牙铁路&I负责的公共公司的本地经理必须选择必须先执行的先生和I项目。基于结果,它变得明显,对于这种情况研究,项目偏好的主要因素是应用的位置而不是项目类型。这项工作的主要贡献是:识别和权衡决策标准的深度分析,如何评估替代方案,并根据文献和专业知识的详尽修订,提供严格和系统的决策过程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号