首页> 外文期刊>Natural Gas Week. >Cheniere Gas Pipeline Finished
【24h】

Cheniere Gas Pipeline Finished

机译:Cheniere气体管道完成

获取原文
获取原文并翻译 | 示例
           

摘要

Cheniere Energy is asking the Federal Energy Regulatory Commission(FERC)for approval to put its Midship gas pipeline in Oklahoma into service no later than Apr.17”in order to meet the needs of its shippers.”At a cost of about $1 billion,Midship consists up to 200 miles of 26 inch pipe designed to deliver about 1.44 billion cubic feet per day of gas from the Anadarko Basin to existing pipelines near Bennington,Oklahoma,for transport to US Gulf Coast and Southeast markets.Some of the gas will be used as feedstock for the growing LNG export industry in the Gulf region.
机译:Cheniere Energy要求联邦能源监管委员会(FERC)批准,以便在俄克拉荷马州的中途气体管道不迟于4月17日,以满足其托运人的需求。“以10亿美元的成本为准, Midshion由最多26英寸的管道组成,旨在将每天104.4亿立方英尺从Anadarko盆地到Bennington,俄克拉荷顿州Bennington附近的现有管道提供给俄克拉荷州,乘坐海湾海岸和东南市场。气体将是 用作海湾地区日益增长的LNG出口行业的原料。

著录项

  • 来源
    《Natural Gas Week.》 |2020年第15期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号