首页> 外文期刊>Natural Gas Week. >Court Pans FERCs Speed on Eminent Domain Reviews
【24h】

Court Pans FERCs Speed on Eminent Domain Reviews

机译:Court Pans Fercs速度在杰出领域评论

获取原文
获取原文并翻译 | 示例
           

摘要

A key federal appeals court last week criticized the speed at which the Federal Energy Regulatory Commission (FERC) reviews landowner challenges to eminent domain decisions during gas pipeline construction — a sign that project developers could face more scrutiny in the future. The hearing, in which the full bench of 11 judges for the US Court of Appeals for the DC Circuit are reviewing an appellate ruling over FERC's approval of the Atlantic Sunrise gas pipeline, seemed to reveal significant concerns about FERC's use of tolling orders that have long been controversial.
机译:上周批评联邦能源监管委员会(FERC)在燃气管道建设中批评联邦能源监管委员会(FERC)挑战对知名域决策的速度 - 项目开发商在未来可能面临更多审查的速度。 听证会,其中11名法官为DC电路提出上诉法官的完整替补,正在审查对FERC批准的大西洋日出天然气管道批准的上诉裁决,似乎揭示了对FERC使用长期收费订单的重要担忧 争议。

著录项

  • 来源
    《Natural Gas Week.》 |2020年第18期|共2页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 工业经济;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号