Sabine Pass Project Will Capture Boil-Off Gas and Increase Send-Out Capacity at LNG Terminal in Louisiana

机译:Sabine Pass项目将捕获慢性气体,并在路易斯安那州的LNG终端提高发射能力

获取原文
获取原文并翻译 | 示例
           

摘要

Sabine Pass LNG, LP (CP11-32) recently requested FERC's authorization pursuant to section 3 of the Natural Gas Act (NGA) to install, own and operate a "redundant" high-pressure boil-off gas (HPBOG) compressor and related facilities at its existing Sabine Pass LNG Terminal, located in Cameron Parish, Louisiana, so the boil-off gas (BOG) may be delivered to the interconnected send-out pipelines during times when the existing HPBOG compressor is not operational and/or the LNG terminal is not sending out gas through the liquefied natural gas (LNG) vaporization process. When completed, the project will have the capability to send out 34 million standard cubic feet per day (MMscf/d) of gas. Combined in parallel operation, the existing and redundant HPBOG compressors will have the ability to compress approximately 59 MMscf/d of gas. Sabine would like the permission no later than January 2011 in order that the proposed project may be constructed and placed in service by July 2011.
机译:Sabine Pass LNG,LP(CP11-32)最近要求FERC的授权根据天然气法案(NGA)的第3条安装,拥有并运营“冗余”高压蒸发气体(HPBOG)压缩机和相关设施 在其现有的Sabine Pass LNG终端,位于路易斯安那州的Cameron Parish,因此在现有的HPBog压缩机不可操作和/或LNG终端时,蒸发汽油(沼泽)可能会被送到互连的发送管道 没有通过液化天然气(LNG)汽化过程发出气体。 完成后,该项目将有能力发出3400万立方英尺(MMSCF / D)的天然气。 在并行操作中结合,现有和冗余的HPBog压缩机能够压缩大约59mmsc / d气体。 Sabine希望未迟于2011年1月的许可,以便在2011年7月在2011年7月建造和置于服务中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号