首页> 外文期刊>European Journal of Industrial Engineering >Human-machine cooperation in planning and scheduling: a case study on an unstable environment
【24h】

Human-machine cooperation in planning and scheduling: a case study on an unstable environment

机译:人机合作规划和调度:对不稳定环境的案例研究

获取原文
获取原文并翻译 | 示例
           

摘要

In an industrial environment, manufacturing systems may be subject to considerable uncertainties which may lead to numerous schedule disturbances. These disturbances prevent the execution of the planned production schedule.'groups of permutable jobs' is one of the most studied methods that deal with this drawback. It constructs a flexible solution characterised by a set of schedules, allowing a human operator to execute, in real-time, the schedule that best fits the state of the shop. However, because of the limited complexity that one human being can handle, he/she needs to cooperate with the machine in order to take efficient decisions. This paper focuses on investigating the human-machine cooperation for planning and scheduling. A new human-machine interface model assisted with a multi-indicator decision support system has been proposed and evaluated. The results show the usefulness/limits of the proposed model and provide insights into the practice of production planning and scheduling.
机译:在工业环境中,制造系统可能受到相当大的不确定性,可能导致许多时间表干扰。这些干扰可以防止执行计划的生产计划。群体的不可挽回的作业'是处理此缺点的最具学习方法之一。它构造了一种灵活的解决方案,其特征在于一组时间表,允许人类运营商实时执行,该时间表能够最适合商店的状态。然而,由于一个人能够处理的复杂性有限,他/她需要与机器合作,以便提高策略。本文重点研究了调查人机合作,以便规划和调度。已经提出并评估了具有多指示决策支持系统的新的人机界面模型。结果显示了拟议的模型的有用性/限制,并提供了对生产计划和调度的实践的见解。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号