【24h】

Madrid plans {EUR}215m Metro extension and new BRT

机译:马德里计划{EUR} 215M地铁延期和新BRT

获取原文
获取原文并翻译 | 示例
           

摘要

Madrid is to invest {EUR}215m in extending its Metro in the northeast of the city and introducing a new bus rapid transit (BRT) system. The Metro project, planned to be open in the middle of next year, takes the lion's share of the cash - {EUR}200m - and was included in the Community of Madrid's Reactivation Plan submitted by regional president Isabel Diaz Ayuso last May. The city is to build three new Metro stations as part of the 4.5km extension from Feria de Madrid station on line 8 to Valdebebas. The first is next to the current Cercanias station and will be an interchange with the city's EMT buses and the new BRT, which will run on a 3.6km route with new electric buses and reserved fast lanes.
机译:马德里是投资(EUR} 215米在城市东北延长其地铁,并介绍一辆新的总线快速运输(BRT)系统。 计划在明年中期开放的地铁项目,狮子的份额是现金 - (欧元} 200m - 并被列入马德里的重新激活计划社区,该计划由Aiabel Diaz Ayuso的Asabel Diaz Ayuso最新组成。 该市是建造三个新的地铁站,作为4.5km延期的一部分从8号线到8号线到Valdebebas。 第一个是当前的Cercanias Station旁边,将与城市的EMT总线和新BRT交汇,这将在带新电动公共汽车和保留快车的3.6km的路线上运行。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号