首页> 外文会议>Rapid Excavation and Tunneling Conference >GROUND TREATMENT FOR TUNNEL CONSTRUCTION OF LINE 10 EXTENSION TO THE MADRID METRO UNDER DIFFICULT GROUND WATER CONDITIONS
【24h】

GROUND TREATMENT FOR TUNNEL CONSTRUCTION OF LINE 10 EXTENSION TO THE MADRID METRO UNDER DIFFICULT GROUND WATER CONDITIONS

机译:地下水条件不佳的地铁10号线地铁延伸至马德里地铁的地面处理

获取原文

摘要

The aim of this paper is to describe and analyze the ground treatment performed between January and May 2002 in order to increase safety during excavation and reduce instability problems along 180 m of tunnel, during the construction works associated with line 10 extension to the Madrid Metro. The tunnel was excavated using the traditional Madrid Method and in the section considered in this paper layers of sand were detected around the tunnel crown area with a significant presence of water, the inflow of which needed to be controlled with a minimum impact on the surrounding environment.
机译:本文的目的是描述和分析2002年1月至2002年5月之间进行的地面处理,以在与马德里地铁10号线延长线相关的建筑工程中增加挖掘过程中的安全性并减少180 m隧道的不稳定问题。该隧道是使用传统的马德里方法开挖的,在本文所考虑的部分中,在隧道冠部周围发现有大量水的沙层,需要对其进水进行控制,而对周围环境的影响应降至最低。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号