...
首页> 外文期刊>E & P: A Hart Energy Publication >Operators find efficiencies in hybrid fracture plug completions
【24h】

Operators find efficiencies in hybrid fracture plug completions

机译:运营商在混合骨折插头完成中找到效率

获取原文
获取原文并翻译 | 示例

摘要

Composite and dissolvable plugs combine for optimal economics. With hundreds of thousands of well stages completed every year using the plug-and-perf (PNP) technique, it is the No. 1 stimulation process used in unconventional reservoirs. The inherent need for plug removal in a PNP operation has fueled the evolution of these devices to incorporate features to facilitate such removal. Early fracture plugs were made from metal and featured solid mandrels, making them extremely robust. As wells became longer and stage count higher, plug millout proved to be challenging. Under such conditions, returns do not easily reach the surface, and fluid is often lost into the recently created fractures. Debris from the plugs removed can accumulate in the horizontal section, posing a risk of getting the coiled tubing (CT) stuck during the operation.
机译:复合和可溶性插头结合了最佳经济学。 每年使用Plug-And-Perf(PNP)技术每年完成数十万个井阶段,它是非传统水库中使用的第1个刺激过程。 PNP操作中的插头移除的固有需求促使这些器件的演化结合以促进这种去除的特征。 早期的骨折塞由金属和特色的固体心轴制成,使它们非常坚固。 由于较长而阶段数量越来越高,插头米局被证明是具有挑战性的。 在这种情况下,返回不容易到达表面,并且流体通常损失到最近产生的骨折中。 从移除插头的碎片可以累积在水平部分中,造成在操作期间陷入困境的卷绕管(CT)的风险。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号