首页> 外文期刊>Iron Ore Outlook >MINING AREA C SOUTH FLANK
【24h】

MINING AREA C SOUTH FLANK

机译:矿区C南侧

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

BHP is in the process of designing and permitting the 80Mtpa Mining Area C (MAC) South Flank project which is around7km south of the MAC North Flank Operations. MAC South Flank will make use of North Flank processing and railinfrastructure.South Flank is being developed in time to replace production from the 80Mtpa Yandi Mine which is expected to bedepleted by 2026. In replacing the lower grade Yandi fines production South Flank is expected to increase BHP’s irongrade from 61% to 62% and lift the company’s lump proportion from 25% to 35%.Mining Area C is BHP’s largest single source of low-phosphorous Marra Mamba and supplies all of the MAC Fines andLump product streams.
机译:BHP在设计和允许80MTPA挖掘区域C(MAC)南侧侧项目的过程中,南侧南部南部的南部约7km。 Mac South Flank将利用北侧侧翼处理和Railinfrastucture.South Flank正在及时开发,以取代80MTPA Yandi Mine的生产,预计将被2026年的床料。在更换较低级的Yandi罚款生产中,预计将增加南侧面的生产南侧 BHP的Irongrode从61%到62%,提升公司的肿块比例从25%到35%。地区C是BHP的低磷Marra Mamba的最大单一来源,并提供所有MAC罚款andlump产品流。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号