首页> 外文期刊>Arabian journal of geosciences >Performance of a deep excavation in Lanzhou strong permeable sandy gravel strata
【24h】

Performance of a deep excavation in Lanzhou strong permeable sandy gravel strata

机译:兰州强渗透砂砾地层深度开挖的表现

获取原文
获取原文并翻译 | 示例
           

摘要

A large air shaft engineered between the Olympic Sports Center Station and Century Avenue Station of the Lanzhou Metro Line one, China, occurred in strong permeable sandy gravel complex strata. The short distance between the Yellow River and the pit (shaft) resulted in many challenges during construction. These challenges mainly included the quick recovery of the water level and the difficulty of plugging the water. Some measures for monitoring the structural safety and response of the surrounding environment were taken. As the data showed, the design combined a bottom-up method with a top-down method using a peripheral cut-off wall for anti-seepage treatment, the underground diaphragm wall and the concrete bracing had a large rigidity, good impermeability and little influence on the surrounding environment in the process of dewatering and excavation, the external plastic concrete cut-off wall could contribute to the groundwater drawdown inside the pit and reduce the soil pressure on the retaining structure of the pit.
机译:奥林匹克体育中心站和中国兰州地铁线的世纪大道站之间的一个大型空气轴发生在强透过砂砾碎石综合体层。黄河和坑(轴)之间的短距离导致建造过程中的许多挑战。这些挑战主要包括水位的快速恢复和堵塞水的难度。采取了监测周围环境结构安全和响应的一些措施。随着数据所显示的,设计将自下而上的方法组合使用用于防渗处理的外围切断墙,地下隔膜壁和混凝土支撑具有大的刚性,良好的不渗透性和影响力很小在脱水和挖掘过程中的周围环境中,外部塑料混凝土切断墙可以促进坑内的地下水拔下并降低坑保持结构的土壤压力。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号