...
首页> 外文期刊>Applied Ergonomics >The use of actor-based immersive health and safety inductions: Lessons from the Thames Tideway Tunnel megaproject
【24h】

The use of actor-based immersive health and safety inductions: Lessons from the Thames Tideway Tunnel megaproject

机译:使用基于演员的沉浸式健康和安全诱导:泰德威隧道巨型课程的课程

获取原文
获取原文并翻译 | 示例

摘要

Health and safety inductions are ubiquitous in construction but tend to be poorly designed and suffer low levels of worker engagement. In this paper we report on the evaluation of an innovative, full day, actor-based health and safety induction called EPIC, currently being used on London's Thames Tideway Tunnel megaproject. As of March 2019, more than 14,000 individuals had attended EPIC. This evaluation examines the impact of EPIC from the perspective of participants and other stakeholders, and considers the utility of actor-based immersive health and safety inductions for use more widely, in both construction and other sectors. Using a mixed-method, longitudinal approach to data collection, EPIC is evaluated against Kirkpatrick's (1959) 'four levels' framework of reactions, learning, behaviour change and results. This paper discusses factors which support and hinder actor-based inductions, and the challenges involved in assessing the impact of inductions on subsequent behaviour and health and safety outcomes.
机译:健康和安全诱导在施工中普遍存在,但往往是设计不佳,遭受较低的工人参与。在本文中,我们报告了史诗般的创新,全天,行动者的健康和安全感应的评估,目前正在伦敦泰德威隧道Megaproject上使用。截至2019年3月,超过14,000人参加了史诗。该评估审查了史诗的影响与参与者和其他利益攸关方的角度,并考虑了演员的沉浸式健康和安全诱导的效用,在建筑和其他部门中更广泛地使用。使用混合方法,纵向方法来数据收集,史诗是针对Kirkpatrick(1959)的“四级”的反应,学习,行为改变和结果的框架。本文讨论了支持和妨碍基于演员的诱导的因素以及评估归类对后续行为和健康和安全结果的影响所涉及的挑战。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号