【24h】

Eni prepares Morocco deep opener

机译:eni准备摩洛哥深开启者

获取原文
获取原文并翻译 | 示例
       

摘要

Eni has set the end of the first quarter of next year as the date for a play opening deepwater wildcat off Morocco. Exploration off the country hit a brick wall after a series of poor results and as operators focused limited capex on proven basins. However Eni, which is one of the most successful explorers in Africa in recent years, will drill on the Rabat Deep Offshore permit in late March or early April. It will target the 768m bbl JP prospect which is a 200sq km four way dip closed faulted prospect, in water depths ranging from 3,280ft to 4,595ft (1,000m to 1,400m).
机译:ENI为明年的第一季度结束,为摩洛哥击中Deepwater Wildcat的日期。 在一系列差的结果和运营商集中于经过验证的盆地的运营商,探索探索砖墙。 然而,eni是近年来非洲最成功的探险家之一,将在3月下旬或4月初举行rabat深层海上许可。 它将针对768米BBL JP前景,这是一个200平方公里的四种方式DIP封闭故障前景,水深范围为3,280英尺至4,595英尺(1,000米至1,400米)。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号