首页> 外文期刊>Advanced Science Letters >The Development of Business Continuity Plan for Online Delivery: A Case Study in Malaysian Private Higher Learning Institution
【24h】

The Development of Business Continuity Plan for Online Delivery: A Case Study in Malaysian Private Higher Learning Institution

机译:在线交付的业务连续性计划的发展 - 以马来西亚私营高校学习机构为例

获取原文
获取原文并翻译 | 示例
           

摘要

Class cancellation due to the unplanned disaster such as haze may cost private higher learning institutions a huge cost. Their reputation may also be at risk. Realizing this one of the private higher learning institutions in Malaysia has taken measures to ensure the classroom continuitydespite the disruption. It captures the measures taken in dealing with classroom continuity during the event of crisis. A model of classroom continuity the event of unplanned disruption is developed for reference by other universities in developing a sustainable and cost effective BusinessContinuity Plan for Curriculum.
机译:由于雾霾等无计划的灾难,课程取消可能会使私人高学习机构造成巨大的成本。 他们的声誉也可能存在风险。 意识到马来西亚私营高校机构的一个采取措施,以确保课堂持续受中断。 它捕获了在危机期间处理课堂连续性所采取的措施。 课堂连续性模型是由其他大学开发出于课程的可持续和成本效益的商业计划计划的其他大学的参考。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号