The Contemporaneous Period Analysis - Split Methodology Forensic Delay, MIP 3.4

机译:同期分析 - 分裂方法法医延迟,MIP 3.4

获取原文
获取原文并翻译 | 示例
           

摘要

The Contemporaneous Period Analysis - Split methodology (Method Implementation Protocol 3.4) is used when a schedule update has been performed based on progress, but schedule modifications have also been made before the schedule is published or submitted. When evaluating liability for delays (and damages related to acceleration) it is necessary to properly assign the project delay to the responsible critical work activities, events, or schedule revisions. This methodology splits the analysis of delays between progress and schedule revisions so each can be evaluated separately, and allows identification and monitoring of lessons learned from forensic analysis such as re-planning failures and erosion of vital float through casual mitigation efforts. This paper will discuss the steps in this process, provide examples of how the method works, and discuss the evaluation of the results.
机译:当基于进度执行计划更新时使用同期分析 - 分割方法(方法实现协议3.4),但在计划发布或提交之前也已经进行了计划修改。 在评估延迟(以及与加速相关的损害赔偿的责任时,有必要将项目延迟妥善将该项目延迟置于负责任的关键工作活动,事件或计划修订。 该方法分配了进度和进度修订之间的延迟的分析,因此每个可以单独评估,并允许通过休闲减缓工作重新规划失败和重要浮动的经验教训的识别和监测。 本文将讨论此过程中的步骤,提供了方法如何工作的示例,并讨论结果的评估。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号