...
首页> 外文期刊>Carbon capture journal >NET Power project achieves first fire milestone
【24h】

NET Power project achieves first fire milestone

机译:净电源项目实现第一艘火里程碑

获取原文
获取原文并翻译 | 示例

摘要

NET Power has successfully achieved first fire of its supercritical carbon dioxide demonstration power plant and test facility located in La Porte, Texas. First fire is a critical milestone for the demonstration plant, as it validates the fundamental operability and technical foundation of NET Power's new power system, which is designed to produce low-cost electricity from natural gas while generating near-zero atmospheric emissions, including full CO2 capture. The achievement also confirms the operation of Toshiba's combustor at commercial scale, as several 50MWth combustors will be used together in NET Power's 300MWe commercial facilities.
机译:净权力已成功实现其超临界二氧化碳示范电厂和测试设施,位于德克萨斯州的La Porte。 第一次火是演示工厂的关键里程碑,因为它验证了净电力新电力系统的基本可操作性和技术基础,旨在从天然气产生低成本的电力,同时产生接近零大气排放,包括全部二氧化碳 捕获。 成就还确认了东芝燃烧器在商业规模中的运作,因为几个50mwth燃烧器将在净电力的300mWWE商业设施中一起使用。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号