首页> 外文期刊>AACE International Transactions >Managing Evidence Preservation at a Construction Accident Site
【24h】

Managing Evidence Preservation at a Construction Accident Site

机译:在建筑事故现场管理证据保全

获取原文
获取原文并翻译 | 示例
           

摘要

Project management applied to a construction project is normally a straightforward process of organizing trade-specialized installation sequences. However, when confronted with a post construction accident forensic building stabilization and evidence recovery project, specialized procedures must be adapted to comply with specific insurance and legal considerations. The typical post construction accident situation is characterized by a project that is at a standstill because of accidental death of one or more workers during construction, alleged safety violations at the site, potential designer and/or constructor liability, and adversarial relationships among all parties (owner, designer, contractor, subcontractors, suppliers, etc.) Generally, tension among the project participants has escalated to a point that a third-party (often the court system) is required to direct the process. In such cases, a court-ordered protocol is established that requires liability insurance providers to engage a construction management professional to manage the performance of specific post-accident work that makes the premises safe, allows for adequate and necessary forensic investigation, documents existing conditions and preserves evidence, and/or allows evidence to be removed and relocated in a specific fashion for ongoing investigation, and allows parties to determine how to proceed with completing the project (e.g., whether to perform remedial work or demolish and start anew). This paper examines specific lessons learned in various aspects of project management including: coordination, communication, document control, laser scan surveying, procurement, scheduling, cost control, safety, site control and security.
机译:应用于建筑项目的项目管理通常是组织贸易专业安装顺序的简单过程。但是,当遇到施工后发生的事故法医建筑物稳定和取证项目时,必须调整专门程序以符合特定的保险和法律考虑。典型的施工后事故情况的特点是,由于一个或多个工人在施工期间意外死亡,据称在现场违反安全规定,潜在的设计者和/或建造者责任以及各方之间的对抗性关系,导致项目处于停顿状态。通常,项目参与者之间的紧张关系已经升级到要求第三方(通常是法院系统)来指导流程的程度。在这种情况下,将建立法院下令的协议,该协议要求责任保险提供商聘请建筑管理专业人员来管理特定的事故后工作的绩效,以确保场所安全,允许进行充分和必要的法医调查,记录现有情况并保留证据和/或允许以特定方式将证据移出并重新放置以进行正在进行的调查,并允许当事方确定如何继续完成项目(例如,是否执行补救工作或拆除并重新开始)。本文考察了在项目管理的各个方面中汲取的具体经验教训,包括:协调,沟通,文档控制,激光扫描勘测,采购,计划,成本控制,安全性,现场控制和安全性。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号