...
首页> 外文期刊>Journal of Hydrology >Evaluation of optimized depth of waterproof curtain to mitigate negative impacts during dewatering
【24h】

Evaluation of optimized depth of waterproof curtain to mitigate negative impacts during dewatering

机译:评估防水窗帘优化深度,减轻脱水过程中的负面影响

获取原文
获取原文并翻译 | 示例

摘要

Dewatering using a combination of waterproof curtain and pumping wells is commonly adopted to ensure the stability of foundation pits in multi-aquifer strata. However, dewatering is likely to result in environmental problems. This paper investigates the impact on surroundings owing to the interaction between the waterproof curtain and pumping wells by numerical simulation. The depth of the diaphragm wall penetrating the dewatering aquifer (D) and the filter length of pumping wells (L) are varied in the simulation. The relationship between approximate hydraulic gradient (Delta i) or ground settlement outside the foundation pit (S) with curtain depth ratio R-D (D over the thickness of the dewatering confined aquifer H-a) or filter length ratio R-L (L/H-a) can be divided into three change parts, namely initial gradual, middle sharp and final gentle part. Three values of R-D and R-L, namely effective, suggested and control value, are proposed. R-D and R-L should vary between the effective and control value. The suggested value of R-D and R-L, is recommended in actual engineering by comprehensive consideration. The effective, suggested and control value of R-D can be calculated by a linear equation according to the value of R-L.
机译:通常采用使用防水窗帘和泵送井的组合脱水,以确保基础凹坑在多含水层层中的稳定性。然而,脱水可能导致环境问题。本文通过数值模拟来研究防水窗帘与泵送井之间的相互作用对周围环境的影响。在模拟中变化了穿透脱水含水层(D)的隔膜壁的深度和泵送井(L)的过滤器长度。窗帘深度比Rd(DATERING Conjined Aquifer Ha的厚度上的基坑I)之间的近似液压梯度(ΔI)或地面沉降之间的关系或滤波长比R1(L / HA)可以分开进入三个变化零件,即初步逐步,中锐,最终的温和部分。提出了三种R-D和R-L的值,即有效,建议和控制值。 R-D和R-L应在有效和控制值之间变化。通过全面考虑,建议在实际工程中进行R-D和R-L的建议值。 R-D的有效,建议和控制值可以根据R-L值计算线性方程。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号