首页> 外文期刊>SBB Steel Markets Daily >ArcelorMittal Gijon furnace still offline on weak demand
【24h】

ArcelorMittal Gijon furnace still offline on weak demand

机译:arcelormittal gijon炉仍在下行弱化需求

获取原文
获取原文并翻译 | 示例
           

摘要

Madrid—ArcelorMittal Spain is operating just one of its two furnaces at its Gijon steel mill after it was taken offline in April, the company told S&P Global Platts. The site has two blast furnaces with combined 4.2 million mt/year crude steel capacity. Furnace A has around 2.7 million mt/year crude steel capacity, according to Platts' data. Spanish industrial data showed a small recovery in May, with the country's industrial production index recovering from a 34% year on year decline in April to an adjusted 24% decline in May, according to official statistics institute INE.
机译:Madrid-ArcelorMittal西班牙在4月份在4月份在其脱机之后,它仅在其Gijon Steel Mill运营它的两个炉子之一,该公司告诉S&P Global Platts。 该网站有两种高炉炉,组合420万吨/年粗钢材能力。 根据普拉特的数据,炉A拥有约270万吨/年粗钢容量。 据官方统计研究所欧洲统计研究所欧洲统计研究所欧洲统计研究所欧洲统计研究所欧洲统计研究所的第45次,该国的工业生产指数恢复较小,该国的工业生产指数从34%的下降到5月下降至5月份的调整后24%。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号