...
首页> 外文期刊>SBB Steel Markets Daily >Swift recovery not assured at LKAB Kiruna iron ore mine
【24h】

Swift recovery not assured at LKAB Kiruna iron ore mine

机译:LKAB Kiruna铁矿石矿山不保证SWIFT恢复

获取原文
获取原文并翻译 | 示例
           

摘要

London—Swedish miner LKAB is yet to move back to full capacity at its biggest iron ore complex in Kiruna following an earthquake, which could hit future pellet supplies. So far, contract-based iron ore sales commitments and agreed loading programs are assured -- the company has not declared force majeure, according to market sources. A longer impact at Kiruna was expected to strain forward sales volumes, including spot availability into China and global markets. A fast return to full output at Kiruna is being hampered as the central core of the earthquake’s damage in the mine mountain is yet to be fully assessed. Four of the 11 production blocks were temporarily closed last week, according to the company.
机译:伦敦瑞典矿工LKAB尚未在地震发生后在基鲁纳的最大铁矿石综合体中恢复全部能力,这可能会击中未来的颗粒供应。 到目前为止,根据市场来源,确保基于合同的铁矿石销售承诺和商定的加载方案尚未宣布不可抗力。 预计对基金的较长影响将对中国和全球市场的现场可用性进行了压力。 随着地震在矿山损坏的核心核心尚未得到完全评估,在基鲁纳的全部返回全部返回全部返回。 据该公司称,11个生产块中的四个生产块暂时关闭。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号