...
首页> 外文期刊>SBB daily eBriefing >CAP Minería sets September restart of Puerto Guacolda II
【24h】

CAP Minería sets September restart of Puerto Guacolda II

机译:Cap Mining集9月重启Puerto Guacolda II

获取原文
获取原文并翻译 | 示例
           

摘要

Chile's CAP Minería plans to restart port operations at Puerto Guacolda II in Huasco inSeptember.The port will reopen through "the installation of a temporary ship loader, with the sameloading capacity as the original, although with some limitations on its mobility,” thecompany said late Friday.The complete rehabilitation of the port is expected to take up to 24 months after theprovisional equipment is installed, it said.
机译:智利的CapMinería计划在华科省普斯科省Puerto Guacolda II重新启动港口运营。该港口将通过“临时船舶装载机的安装,以Sameloading容量为原件,虽然有一些局限性的移动性,”TheCompany迟到了 星期五,港口的完全康复预计将在安装厂房安装后24个月,所以说。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号