...
首页> 外文期刊>Control Engineering Europe >For fieldbus reliability, prevention is better than a cure
【24h】

For fieldbus reliability, prevention is better than a cure

机译:对于现场总线的可靠性,预防胜于治疗

获取原文
获取原文并翻译 | 示例
           

摘要

A planned monitoring regime to diagnose problems before they cause failure can keep productivity up and costs down. Foundation Fieldbus (FF) has had major success across the world as a digital, two-way communications system. Part of this success is based on its renowned reliability - a critical requirement for any process plant that has to run constantly. But even FF is not infallible. The most common source of problems is at the physical layer. These components include the cable, wiring components, power supplies, conditioners and terminators. Planned monitoring is one way of detecting problems before they result in failure and loss of production. However, implementing the best planned monitoring scheme is not easy, and even when it is in place, interpreting the data in order to track down the actual fault is difficult and time-consuming.
机译:有计划的监控机制可以在问题引起故障之前进行诊断,从而可以提高生产率并降低成本。基金会现场总线(FF)作为数字双向通讯系统在全球范围内取得了重大成就。成功的部分原因在于其著名的可靠性-对任何必须持续运行的过程工厂而言都是至关重要的要求。但是,即使FF也不是绝对可靠的。问题的最常见来源是物理层。这些组件包括电缆,接线组件,电源,调节器和终端器。计划的监视是在问题导致故障和生产损失之前发现问题的一种方法。但是,实施最佳计划的监视方案并不容易,即使在适当的位置,解释数据以跟踪实际故障也是困难且耗时的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号