首页> 外文期刊>E&P daily >Nganhurra FPSO EP tabled
【24h】

Nganhurra FPSO EP tabled

机译:Nganhurra FPSO EP提交

获取原文
获取原文并翻译 | 示例
           

摘要

Woodside has resubmitted an Environment Plan (EP) to undertake activities at the Enfield offshore oil field to support cessation of production activities to the Australian authorities. The Woodside-operated Enfield oil field is located in WA-28-L. Oil from the field is processed on the Nganhurra FPSO, which has been in production since 2006, and the processed stabilised crude oil is then offloaded to offtake tankers.
机译:Woodside重新提交了一个环境计划(EP),在恩菲尔德海上石油领域进行活动,以支持澳大利亚当局的生产活动停止。 窗框操作的ENFIELD油田位于WA-28-L。 从2006年以来,该领域的石油是在生产的Nganhurra FPSO上,然后将加工的稳定的原油卸载到排水罐。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号