首页> 外文期刊>E&P daily >Minerva plant gets $55m spend
【24h】

Minerva plant gets $55m spend

机译:Minerva工厂花费55米

获取原文
获取原文并翻译 | 示例
           

摘要

Australia’s Cooper Energy and Japanese partner Mitsui Group will spend US $55m to upgrade the idle Minerva Gas Plant in Australia, which will allow the supply of 429.75 MMcm (15.17 Bcf) of so far undeveloped gas. In December 2019, Cooper and Mitsui took pos- session of the Minerva Gas Plant. Since then the Front-End Engineering and Design (FEED) work has been completed to support a Final Investment Decision (FID) to upgrade and connect the plant to process gas produced from the existing Casino, Henry and Netherby offshore fields in the VIC L24/L30 areas.
机译:澳大利亚的Cooper Energy和Japanese Partner Mitsui Group将花费5500万美元升级澳大利亚的空闲Minerva煤气厂,这将供应429.75 mmcm(15.17bcf)到目前为止未开发的气体。 2019年12月,Cooper和Mitsui采取了Minerva煤气厂的POS。 从那时起,前端工程和设计(饲料)工作已经完成,以支持最终的投资决策(FID)来升级和连接工厂,以处理VIC L24中现有赌场,亨利和盖尔比海上场地生产的天然气/ L30区域。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号