首页> 外文期刊>Argus FSU energy >Gazprom details 2018 infrastructure spending
【24h】

Gazprom details 2018 infrastructure spending

机译:Gazprom详细信息2018基础设施支出

获取原文
获取原文并翻译 | 示例
           

摘要

Gazprom will exceed its initial plans for spending on transport and LNG infra- structure projects this year, although expenditure on its large export pipelines will be either fat or down compared with 2017. Total 2018 infrastructure investment comes to nearly Rbs763bn ($11.6bn) under the recently revised plan, up from the Rbs707bn approved in late 2017 (see table). Most of the rise is accounted for by the 1.5mn t/yr Portovaya LNG and 2mn t/yr Kaliningrad LNG projects on the Baltic Sea and the 870km Gryazovets- Slavyanskaya feeder pipeline for the 55bn m~3/yr Nord Stream 2 export project.
机译:琶大将超越今年运输和液化天然气开发计划项目的初步计划,尽管其大型出口管道的支出与2017年相比将肥胖或跌幅。2018年的基础设施投资总数达到近卢比(11.6亿美元) 最近修订的计划,从2017年底批准的RBS707BN(见表)。 大部分崛起都是由波罗的海的1.5mn t / yr portovaya lng和2mn t / yr Kaliningrad Lng项目和870km gryazovets-斯拉维斯卡耶饲料管道,为55亿m〜3 / yr nord Store 2出口项目。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号