首页> 外文期刊>Water Science and Technology >A flood lamination strategy based on transportation network with time delay
【24h】

A flood lamination strategy based on transportation network with time delay

机译:基于时滞运输网络的洪水分层策略

获取原文
获取原文并翻译 | 示例
           

摘要

Over the last few years, the frequency and intensity of floods has become more marked due to the influence of climate change. The engendered problems are related to the safety of goods and persons. These considerations require predictive management that will limit water height downstream. In the literature, numerous works have described flow modeling and management. The work presented in this paper is interested in quantitative management by means of flood expansion areas placed along the river and for which we have size and location. The performance of the management system depends on the time and height of gate opening, which will influence wave mitigation. The proposed management method is based on use of a transportation network with time delay from which the volume of water to be stored is calculated.
机译:在过去的几年中,由于气候变化的影响,洪水的频率和强度变得更加明显。由此产生的问题与货物和人员的安全有关。这些考虑因素需要进行预测管理,以限制下游的水位。在文献中,许多工作描述了流量建模和管理。本文介绍的工作对通过沿河设置的洪水扩展区(我们拥有规模和位置)的量化管理感兴趣。管理系统的性能取决于闸门打开的时间和高度,这将影响波的缓解。所提出的管理方法是基于对运输网络的使用,该运输网络具有时间延迟,由此可以计算出要存储的水量。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号