首页> 外文期刊>Platt's Oilgram News >Statoil in clash with Norway over delays
【24h】

Statoil in clash with Norway over delays

机译:挪威国家石油公司因延误而与挪威发生冲突

获取原文
获取原文并翻译 | 示例
       

摘要

London—The Norwegian Petroleum Directorate has clashed with the 67% state-controlled Statoil, the biggest oil and gas operator by far on the shelf, telling it to go ahead with a small oil development that the group is seeking to delay. The NPD told Platts that the directorate had responded to a request from Statoil, insisting that precepts governing responsible resource exploitation in the Norway’s petroleum law meant that development of the 50 million barrel Trestakk discovery in the Norwegian Sea must continue to original plan. The plan for Trestakk was as a subsea tieback to the nearby Asgard field with a production start in 2018.
机译:伦敦-挪威石油总局与67%的国家控制的挪威国家石油公司(Statoil)发生了冲突,挪威国家石油公司是目前为止最大的石油和天然气运营商,并告诉该集团进行小规模的石油开发,该集团正寻求延迟。 NPD告诉普氏能源资讯公司,该局已经回应了挪威国家石油公司的要求,坚持认为规范挪威石油法中负责任的资源开采的戒律意味着在挪威海中开发5000万桶Trestakk石油发现必须继续按原计划进行。 Trestakk的计划是在附近的阿斯加德(Asgard)油田进行海底绑架,并于2018年开始生产。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号