首页> 外文期刊>Mining Journal >Xstrata suspends Falcondo on nickel price drop
【24h】

Xstrata suspends Falcondo on nickel price drop

机译:Xstrata因镍价下跌而暂停Falcondo

获取原文
获取原文并翻译 | 示例
           

摘要

XSTRATA pic has suspended output at its Falcondo nickel mining and processing facility in the Dominican Republic, after falling nickel prices exacerbated by rising oil costs, rendered the mine unprofitable. The Falcondo plant, which produces 29,000t/y of nickel, or 2 percent percent of world supply, may be closed for four months, Xstrata warned. "The resumption of activities will be assessed based on market conditions, which are expected to improve towards the end of 2008,"said Ian Pearce, chief executive of Xstrata's nickel unit.
机译:XSTRATA pic已暂停多米尼加共和国Falcondo镍矿开采和加工设施的产量,此前镍价下跌因石油成本上涨而加剧,致使该矿场无利可图。 Xstrata警告称,法尔康多工厂的镍产量为每年29,000吨,占世界供应量的2%,可能会关闭四个月。 Xstrata镍部门首席执行官伊恩·皮尔斯(Ian Pearce)表示:“将根据市场情况评估活动的恢复,预计到2008年底情况会有所改善。”

著录项

  • 来源
    《Mining Journal》 |2008年第22期|共1页
  • 作者

    MIKE LOVESEY;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号