首页> 外文期刊>Fertilizer Week >PotashCorp announces production cuts at Cory
【24h】

PotashCorp announces production cuts at Cory

机译:PotashCorp宣布在Cory减产

获取原文
获取原文并翻译 | 示例
           

摘要

PotashCorp this week announced that it will decrease the operational capability of its Cory mine in Saskatchewan by 600,000 mt MOP/year in an attempt to optimise production at its lower cost mines. As a result of the move, Cory will have an expected operational capability of approximately 800,000 mt white MOP, with red product no longer produced. Around 100 permanent employees and 40 temporary positions will be cut from PotashCorp’s workforce. Cory’s output cut is not surprising given the ramp-up of Rocanville, a mine with lower production costs. Moreover, potash capacity in Saskatchewan will increase markedly once K+S Legacy comes on stream. Legacy is expected to achieve first production in Q2 2017 and K+S is targeting output capacity of 2 million mt at the end of 2017.
机译:钾肥公司本周宣布,它将把萨斯喀彻温省科里矿山的运营能力降低60万公吨/年,以优化其低成本矿山的生产。搬迁的结果是,Cory预计将具有约80万吨白色MOP的运营能力,不再生产红色产品。 PotashCorp的员工将裁减约100名固定员工和40个临时职位。鉴于生产成本较低的Rocanville矿的产量提高,Cory的减产不足为奇。此外,一旦K + S Legacy投入生产,萨斯喀彻温省的钾肥产能将显着增加。 Legacy有望在2017年第二季度实现首批生产,K + S的目标是在2017年底达到200万吨的产能。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号