首页> 外文期刊>International Oil Daily >Output From Indonesia's Bontang LNG to Drop
【24h】

Output From Indonesia's Bontang LNG to Drop

机译:印尼Bontang液化天然气的产量将下降

获取原文
获取原文并翻译 | 示例
       

摘要

Output from Indonesia's Bontang LNG plant may drop further this year due to lower natural gas supply from the Total-operated Mahakam block in East Kalimanatan. "Currently, supply from the Mahakam block is around 1.8 billion cubic feet per day, down from the targeted 2 Bcf/d. The impact would be LNG production in the Bontang plant may be reduced by between 18 to 20 cargoes this year," Hardiono, vice chairman of upstream regulator BP Migas, told International Oil Daily on Wednesday.
机译:印尼Bontang液化天然气工厂的产量今年可能进一步下降,这是由于东卡里马纳丹(East Kalimanatan)全面运营的Mahakam区块的天然气供应减少。 “目前,Mahakam区块的每日供应量约为18亿立方英尺,低于目标2 Bcf / d。这将影响Bontang工厂的LNG生产,今年可能减少18至20船货物,” Hardiono上游监管机构BP Migas的副董事长周三对《国际石油日报》表示。

著录项

  • 来源
    《International Oil Daily》 |2012年第19期|共2页
  • 作者

    Muklis Ali;

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类
  • 关键词

  • 入库时间 2022-08-19 13:00:24

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号