...
首页> 外文期刊>Arab Oil & Gas >Exploration Operations to Be Speeded Up Following the Award of New Contracts for Drilling Rigs and Equipment
【24h】

Exploration Operations to Be Speeded Up Following the Award of New Contracts for Drilling Rigs and Equipment

机译:授予钻机和设备新合同后,将加快勘探作业

获取原文
获取原文并翻译 | 示例

摘要

Saudi Aramco has just placed orders for drilling rigs and wellhead equipment with Rowan Companies Inc.and three consortia composed of Saudi and foreign companies.Because of the general shortage of rigs and drilling equipment,in 2005 the company started to take steps to ensure its requirements for the future were met,as part of its strategy for increasing its oil production capacity to 12.5 million b/d by 2009 and speeding up its exploration and development activities(AOG,16 Oct.and 1 Dec,2005).Saudi Aramco has also retained BGP Arabia,a subsidiary of the Chinese company BGP International,for the conduct of seismic surveys in the Red Sea and other parts of the country.
机译:沙特阿美刚刚向Rowan Companies Inc.和三个由沙特和外国公司组成的财团下达了钻机和井口设备的订单。由于钻机和钻井设备的普遍短缺,该公司于2005年开始采取步骤来确保其要求作为未来战略的一部分,沙特阿美还计划到2009年将其石油生产能力提高到每天1,250万桶,并加快勘探和开发活动(AOG,2005年10月16日和12月1日)。保留了中国BGP国际公司的子公司BGP Arab,用于在红海和该国其他地区进行地震勘探。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号