...
首页> 外文期刊>Concrete Products >Impervious problem, solid solution
【24h】

Impervious problem, solid solution

机译:不渗透的问题,坚实的解决方案

获取原文
获取原文并翻译 | 示例
           

摘要

Is inevitable as population growth and its attendant urban sprawl is the disruption of natural drainage patterns. While rising waters may never be halted, flood-control technologies now provide the means to curtail the effects of rampaging rivers and stormwater. A significant factor in flooding problems, concrete also plays an important role in stormwater management. The devastation of the 1981 Memorial Day Flood in Austin, Texas-killing 13 people and wreaking 36 million dollars in damage-led to the development of a watershed-protection master plan. Within the 30-sq.-mile Williamson Creek watershed, a system of tributaries and creeks in Austin's far southeastern district, the most vulnerable area encompassing the greatest number of at-risk houses was found to be the Creek Bend neighborhood. Flash flooding in that vicinity, as reported by Miami-based engineers PBS&J, can increase normal water flow of roughly 200 gallons per minute to as much as 13 million gallons a minute.
机译:这是不可避免的,因为人口增长及其伴随的城市扩张是自然排水模式的破坏。虽然上升的水可能永远都不会停止,但防洪技术现在提供了减轻河流和雨水泛滥的影响的手段。混凝土是洪水问题的重要因素,混凝土在雨水管理中也起着重要作用。 1981年阵亡将士纪念日洪水在得克萨斯州奥斯汀造成破坏,造成13人死亡,造成3600万美元的损失,导致制定了分水岭保护总体规划。在30英里的Williamson Creek流域中,奥斯汀最东南的地区由支流和小河组成,最脆弱的地区是克里克本德(Creek Bend)社区,其中包括数量最多的危险房屋。正如迈阿密工程师PBS&J报道的那样,该地区的山洪泛滥可将正常水流量从每分钟200加仑提高到每分钟1300万加仑。

著录项

  • 来源
    《Concrete Products》 |2004年第5期|共1页
  • 作者

  • 作者单位
  • 收录信息
  • 原文格式 PDF
  • 正文语种 eng
  • 中图分类 水泥工业;
  • 关键词

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号