...
首页> 外文期刊>Journal of water, sanitation and hygiene for development >Determination of capital costs for conventional sewerage systems (collection, transportation and treatment) in a developing country
【24h】

Determination of capital costs for conventional sewerage systems (collection, transportation and treatment) in a developing country

机译:确定发展中国家常规污水处理系统(收集,运输和处理)的资本成本

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Unit construction costs expressed as ranges of values are useful in most preliminary studies, in which detailed designs are not available in order to support specific cost estimates. This paper presents ranges of values for capital costs related to conventional sewerage systems in Brazil. The data were based on published references or information from consulting firms and sanitation companies and comprised budgets made at the design stage or after completion of the works. All cost data were converted to the common date of April 2010. The unit costs were expressed as: collection system (US$/m and US$/inhabitant), transportation system (US$/m and US$/inhabitant) and treatment system (US$/inhabitant). Total costs for the implementation of the overall sewerage system (collection, transportation and treatment) ranged from around US$170 to US$770/inhabitant, depending on pipe diameter and on pipe-laying conditions (percentage of rocks and pavement), as well as on the treatment process employed. In all cases, approximately 60% of the total capital costs were represented by the collection system. The influence of the transportation (interceptor) costs was also investigated and found to indicate that, for small populations, the construction costs associated with the interceptors may be larger than those linked to the treatment plants.
机译:在大多数初步研究中,用值范围表示的单位建筑成本是有用的,在这些研究中,没有详细的设计来支持特定的成本估算。本文介绍了与巴西常规污水处理系统相关的资本成本值范围。数据基于已发布的参考文献或咨询公司和卫生公司的信息,包括设计阶段或工程完成后的预算。所有成本数据均转换为2010年4月的共同日期。单位成本表示为:收集系统(美元/平方米和美元/居民),运输系统(美元/平方米和美元/居民)和处理系统(美元/居民)。实施整个污水处理系统(收集,运输和处理)的总成本在每人约170美元至770美元之间,具体取决于管道直径和铺设条件(岩石和路面的百分比)以及所采用的治疗方法。在所有情况下,收款系统约占总资本成本的60%。还对运输(拦截器)成本的影响进行了调查,发现表明,对于人口少的地区,与拦截器相关的建筑成本可能大于与处理厂相关的建筑成本。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号