首页> 外文期刊>Journal of systems architecture >Schedulability analysis of periodic and aperiodic tasks with resource constraints
【24h】

Schedulability analysis of periodic and aperiodic tasks with resource constraints

机译:具有资源约束的周期性和非周期性任务的可调度性分析

获取原文
获取原文并翻译 | 示例
获取外文期刊封面目录资料

摘要

In this paper, we address the problem of scheduling hybrid task sets consisting of hard periodic and soft aperiodic tasks that may share resources in exclusive mode in a dynamic environment, where tasks are scheduled based on their deadlines. Bounded blocking on exclusive resources is achieved by means of a dynamic resource access protocol which also prevents deadlocks and chained blocking. Aperiodic responsiveness is enhanced by an efficient servicing technique which assigns each aperiodic request a suitable deadline. Feasibility conditions are extended to handle tasks with deadlines different from periods and a reclaiming technique is presented to deal with early completions.
机译:在本文中,我们解决了调度混合任务集的问题,该任务集由硬周期性和软非周期性任务组成,它们可以在动态环境中以排他模式共享资源,在动态环境中,任务是根据其截止日期进行调度的。排他资源上的有界阻塞是通过动态资源访问协议来实现的,该协议还可以防止死锁和链接阻塞。通过为每个非周期性请求分配合适的期限的有效服务技术,可以提高非周期性响应能力。扩展了可行性条件,以处理期限不同于期限的任务,并提出了回收技术来处理早期完成。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号