首页>
外国专利>
Scheduling allocation of a combination of resources to a task that has a constraint
Scheduling allocation of a combination of resources to a task that has a constraint
展开▼
机译:计划将资源组合分配给具有约束的任务
展开▼
页面导航
摘要
著录项
相似文献
摘要
A scheduling process is provided for scheduling allocation of resources to a task, each resource having a plurality of attributes, the task having one or more operational constraints including a required plurality of capabilities, and having a performance condition. For example, the resources' attributes are reviewed to identify combinations of resources that collectively satisfy the task's capability requirements. Each identified combination of resources is evaluated according to a performance algorithm to identify an associated performance cost. A combination of resources is selected whose identified performance cost meets the performance condition. The task is scheduled based on the selected combination of resources.
展开▼