...
首页> 外文期刊>Journal of Quality in Maintenance Engineering >Integrated maintenance and production planning: a model to include rescheduling costs
【24h】

Integrated maintenance and production planning: a model to include rescheduling costs

机译:集成的维护和生产计划:包括重新计划成本的模型

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Purpose - Maintenance is a key lever for reducing costs in manufacturing companies. Researchers have focused in the past on the importance of integrating maintenance and production planning to obtain total cost savings and have proposed a number of models. Nonetheless, all such contributions take a static perspective and do not consider the dynamics of markets, e.g. when some already committed preventive maintenance (PM) interventions are to be rescheduled. Therefore, the aim of this paper is to suggest a new decision-making process to manage the rescheduling of PM interventions and to show - through the proposal of an ad hoc planning model - the economical savings from expressly considering rescheduling costs in re-planning PM interventions.Design/methodology/approach - In this paper the authors used six case studies to infer both the current process of production and maintenance integrated planning and the decision-making process followed for rescheduling PM interventions. From the current practices the authors derived a new managerial framework for managing rescheduling events and they have built two mathematical models to compare the current and the proposed frameworks by using real data. Findings - Considering rescheduling costs in the joint production and maintenance planning process leads to significant economical savings under all the scenarios tested. In particular, the use of the proposed model allows significant reductions in maintenance costs while keeping constant production costs. This makes the implementation of the authors' proposal in real companies easier. Originality/value - This research originates from the wish of a real company to better investigate the issue of rescheduling interventions. To the best of the authors' knowledge this is the first study to face the problem of rescheduling PM interventions and to present a mathematical model to support managers in such a decision-making process.
机译:目的-维护是降低制造公司成本的关键杠杆。过去,研究人员将重点放在整合维护和生产计划以节省总成本的重要性上,并提出了许多模型。但是,所有这些贡献都是静态的,没有考虑市场的动态,例如重新安排一些已经实施的预防性维护(PM)干预措施的时间。因此,本文的目的是提出一个新的决策程序来管理PM干预的重新安排,并通过提出一个临时计划模型来显示在重新规划PM中明确考虑重新安排成本所带来的经济节省设计/方法/方法-在本文中,作者使用六个案例研究来推断当前的生产和维护集成计划流程以及为重新安排PM干预计划所遵循的决策流程。作者从当前的实践中得出了一个用于管理重新安排事件的新管理框架,他们建立了两个数学模型,以通过使用实际数据来比较当前框架和提议的框架。调查结果-在联合生产和维护计划过程中考虑重新安排成本可以在所有测试的情况下节省大量经济费用。特别地,使用所提出的模型可以在保持不变的生产成本的同时显着降低维护成本。这使得在真实公司中更容易执行作者的建议。原创性/价值-这项研究源自一家真正公司希望更好地调查重新安排干预措施的问题。就作者所知,这是第一个研究,它面临着重新安排PM干预计划的问题,并提出了一个数学模型来支持经理在这样的决策过程中。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号