首页> 外文期刊>Journal of Quality in Maintenance Engineering >Optimal preventive maintenance planning for multiple elevators
【24h】

Optimal preventive maintenance planning for multiple elevators

机译:多台电梯的最佳预防性维护计划

获取原文
获取原文并翻译 | 示例
       

摘要

The purpose of this paper is to properly plan the preventive maintenace schedule for maintenance cost consisting of the labor cost,the part cost,and the quality cost(the loss evaluated in terms of cost,to be incurred when an elevator breaks down)is to be minimized.The method is prescheduted of setting up the optimal preventive maintenance schedule on a long-term basis by rescheduling the contents of schedule dynamically and flexibly in accordance with the ever-changing maintenance conditions,taking the possibility of the future occurrence of failure into consideration.From numerical experiments,the ualidity of the proposal procedure for planning the preuentive maintenance schedule and the effectiveness of considering the possibility of the future occurrence of failure in planning the schedule are shown,and the optimal number of maintenance workers can be decided
机译:本文的目的是适当地计划维护成本的预防性维护计划,其中包括人工成本,零件成本和质量成本(按电梯故障发生的成本损失)。该方法是预先计划的,可以根据不断变化的维护条件动态灵活地重新计划计划的内容,从而长期制定最佳的预防性维护计划,从而将将来发生故障的可能性纳入考虑范围。通过数值实验,表明了总体维护计划的建议程序的整体性以及在计划计划中考虑将来发生故障的可能性的有效性,并可以确定最佳的维护工人数

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号