首页> 外文期刊>Journal of Protective Coatings & Linings >Abhe & Svoboda Wins Phase II of Huey Long Bridge Contract
【24h】

Abhe & Svoboda Wins Phase II of Huey Long Bridge Contract

机译:Abhe&Svoboda赢得了Huey Long Bridge合同的第二阶段

获取原文
获取原文并翻译 | 示例
       

摘要

Abhe & Svoboda, Inc. (Prior Lake, MN), SSPC-QP 1 and-QP 2-certified, won a $21,874,935 contract from the Louisiana Department of Transportation and Development to repair, clean, and recoat railroad approaches on the Huey Long Bridge, a 5,879-foot-long continuous steel truss through deck bridge over the Mississippi River in Baton Rouge, LA. Not to be confused with the Huey Long Bridge in Jefferson Parish, LA, this bridge opened in 1940 and carries four lanes of US-190 traffic and a Kansas City Southern rail line over the river.
机译:Abhe&Svoboda,Inc.(明尼苏达州普里尔湖)获得SSPC-QP 1和-QP 2认证,从路易斯安那州交通与发展部获得了21,874,935美元的合同,用于维修,清洁和重新涂装上长桥的铁路,一个5879英尺长的连续钢桁架穿过位于洛杉矶巴吞鲁日的密西西比河上的桥架。不要与路易斯安那州杰斐逊教区的休伊长桥相混淆,这座桥于1940年开放,拥有四条US-190车道和河上的堪萨斯城南部铁路线。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号