...
首页> 外文期刊>Journal of Performance of Constructed Facilities >Cable Replacement Method for Cable-Stayed Bridges Based on Sensitivity Analysis
【24h】

Cable Replacement Method for Cable-Stayed Bridges Based on Sensitivity Analysis

机译:基于灵敏度分析的斜拉桥电缆更换方法

获取原文
获取原文并翻译 | 示例
   

获取外文期刊封面封底 >>

       

摘要

Cable replacement is one of the key technologies used in the successful operation and maintenance of cable-stayed bridges. Removing cables causes structural variations. Selecting a replacement method affects bridge safety during the cable replacement process. A sensitivity analysis was applied to assess the variations of force and deflection in the Sutong Bridge, China. Reasonable methods for both the quantity and position of replacing cables were provided; the bending strain energy changes induced by the cable removal were also analyzed to study the effects of different cable replacement sequences. Comparison of different cable removal schemes showed that both the induced cable force and beam stress change had their most significant influence on the nearest cables to those removed ones. Practically, the largest peak value of cable force increment appeared when removing the shortest cables. The peak value was practically identical with little apparent variation when removing one cable in the central span. The largest beam stress variation arose because of the longest cables (or their nearest neighbors) being removed. The maximum deflection of the tower top had a decreased tendency when the removed cable became short. The bending strain energy also decreased in a similar fashion. Based on the analysis results, replacing one cable from the side span and replacing four cables asymmetrically was recommended, and a replacement sequence running from the shortest cable to longest cable proved to be optimal.
机译:电缆更换是斜拉桥成功运营和维护中使用的关键技术之一。拆除电缆会导致结构变化。选择替换方法会影响电缆替换过程中的桥安全性。应用灵敏度分析来评估中国苏通大桥的力和挠度变化。提供了更换电缆数量和位置的合理方法;还分析了电缆拆除引起的弯曲应变能变化,以研究不同电缆更换顺序的影响。对不同电缆拆除方案的比较表明,感应电缆力和梁应力变化对最接近被拆除电缆的电缆影响最大。实际上,在拔出最短的电缆时会出现最大的电缆力增量峰值。去除中心跨距中的一根电缆时,该峰值几乎相同,几乎没有明显变化。由于移除了最长的电缆(或其最近的邻居),导致了最大的束应力变化。当拆除的电缆变短时,塔顶的最大挠度减小。弯曲应变能也以类似的方式减小。根据分析结果,建议从侧面跨度中更换一根电缆并非对称地更换四根电缆,事实证明,从最短电缆到最长电缆的更换顺序是最佳的。

著录项

相似文献

  • 外文文献
  • 中文文献
  • 专利
获取原文

客服邮箱:kefu@zhangqiaokeyan.com

京公网安备:11010802029741号 ICP备案号:京ICP备15016152号-6 六维联合信息科技 (北京) 有限公司©版权所有
  • 客服微信

  • 服务号